MELBOURNE’S MOST EXPERIENCED
ENVIRONMENTAL CONSULTANTS

Environmental Consulting Jobs Done in Epping 3076

Below is a list of Environmental Consulting jobs done by Atma Environmental in Epping

Clean Fill Investigation at Bradman Terrace, Epping, Vic.

A new subdivision requiring removal of soil and rock was investigated to ensure the spoil could be classified as clean fill.

Remediation Project at Cooper Street, Epping, Victoria

Firing range use over approximately 15 years left extreme lead levels in a disused quarry requiring remediation to standard residential levels.

Remediation Project at Cooper Street, Epping, Victoria

Firing range use over approximately 15 years left extreme lead levels in a disused quarry requiring remediation to standard residential levels.

Soil Sampling at Brush Road, Epping, Victoria

Client wished to develop this property for standard residential purposes. Atma Environmental constructed four targeted boreholes (in suspect fill material) to make sure that the site was suitable for the intended use.

Site History Assessment at Epping Rd, Epping North, Victoria

In relation to the tendering for purchase of this outer fringe rural site, the company provided a time sensitive historical review report on the 91 ha site.

Phase 3 Site Remediation at Epping Road, Epping North, Victoria

Atma Environmental was retained by the customer to supervise the removal and disposal of contaminated soil and validate the site after excavation.

Contamination Overview & Site Environmental Management Plan (SEMP) at Epping Northeast Precinct, Victoria

An overview of the entire local area’s potential for contamination was provided. In addition, a SEMP covering contamination and other issues was then developed to direct further investigations as part of the Local Area Structure Plan.

Phase 2 Environmental Site Assessment at Craigieburn Road East & Harvest Home Road, Epping, Vic

Assessment of environmental liabilities prior to development.

Phase 2 Environmental Site Assessment at Harvest Home Road & Epping Road, Epping, Victoria

Close-in urban-fringe property (91.5 ha) required assessment of fill material and potential for contamination arising from previous agricultural activities on the site. Phase 2 investigation carried out to assess the presence of contamination prior to residential development of the site.

Phase 3 Site Remediation at Harvest Home Road & Craigieburn Road, Epping, Victoria

Removal of contaminated soil hotspots as identified in a previous Phase II investigation. Site (urban fringe) is to be developed for residential purposes.

Sub-surface Investigation at Epping Plaza, Epping, Victoria

Investigation of a former landfill site now required for use as a shopping plaza. Atma Environmental investigated the depth of fill and contamination status of the filled area to optimise excavation costing.

Soil Validation and Classification Sampling at Epping Plaza, Epping, Victoria

The client retained Atma Environmental to conduct soil sampling for the purpose of classifying soils to meet regulations regarding transport and disposal of contaminated soil.

Site Remediation at Epping Road, Epping, Victoria

In early August 2005 civil works being undertaken for site development discovered asbestos and inert waste material at the subject site. The presence of waste had been identified by Atma Environmental in a previous report and Atma Environmental further undertook site sampling in the area to assess the then existing conditions. This engagement saw Atma oversee removal of ~30,000 t of waste from the site, manage the civil works contract on behalf of client and then complete final sampling indicating final suitability for residential use.

Environmental Site Investigation at Harvest Home Rd, Epping

Re-assessment of this site was performed to establish the nature and extent of contaminated fill material (asbestos, metals) affecting the central portion of the site with a view to determining clean up costs regarding residential subdivision.

Phase 1 Environmental Site Assessment at Wurundjeri Dr, Epping

Environmental inspection and desktop review for a Phase 1 PSI was undertaken for this pharmaceutical manufacturing client at its’ industrial park location.

Site Inspection for Asbestos in Harvest Home Road, Epping

A site with known asbestos-in-soil issues was cleared of vegetation, then visually inspected on regular transects with GPS for the presence of asbestos in order to assess opportunities for reclamation of wastes and the likely disposal classification (based on observations) of imported fill covering the land.

Limited Phase 2 Environmental Site Assessment in Harvest Home Rd, Epping, VIC

Phase 2 ESA of an urban fringe paddock containing fill material was completed to address Council’s requirement for a contaminated land assessment of the site prior to development.

Phase 2 Environmental Site Assessment in Harvest Home Road, Epping, VIC

Assessment of a large urban fringe potential development site containing significant volumes of imported wastes and asbestos affected fill material.

Site Contamination Inspection & Assessment in Harvest Home Rd, Epping

A limited and cost effective site assessment was carried out to satisfy the preliminary environmental site investigation planning requirement by Council.

Preliminary Environmental Site Assessment in 60 Harvest Home Road, Epping, Victoria

Atma Environmental was engaged to conduct a Preliminary Environmental Site Assessment including limited soil sampling and site inspection for proposed residential developments. The sampling consisted of 20 samples from 2 stockpiles as well as sampled collected at 5 locations.

Soil Investigation at Proposed Primary School, Lyndarum Drive, Epping North East, Vic (Lyndarum Drive & Dunolly Street, Epping North East, Victoria)

A Soil Investigation Report in response to an urgent client request that was delivered on-time and on-budget. Project required assessment of imported fill material erroneously placed by a contractor over the site previously cleared by Atma Environmental.

Site Suitability Assessment

Site suitability assessment for the Department of Education & Training. Involved a Preliminary Environmental Site Assessment and project management of a team consisting of archaeologists, flora and fauna consultants and a geotechnical consultants.

Sub-surface Investigation

Investigation of a former landfill site now required for use as a shopping plaza. Atma Environmental investigated the depth of fill and contamination status of the filled area to optimise excavation costing.

Soil Validation and Classification Sampling

The client retained Atma Environmental to conduct soil sampling for the purpose of classifying soils to meet regulations regarding transport and disposal of contaminated soil.

Phase 3 Site Remediation

Removal of contaminated soil hotspots as identified in a previous Phase II investigation. Site (urban fringe) is to be developed for residential purposes.

Soil Validation and Classification Sampling

The client retained Atma Environmental to conduct soil sampling for the purpose of classifying soils to meet regulations regarding transport and disposal of contaminated soil.

Phase 2 Environmental Site Assessment

Close-in urban-fringe property (91.5 ha) required assessment of fill material and potential for contamination arising from previous agricultural activities on the site. Phase 2 investigation carried out to assess the presence of contamination prior to residential development of the site.

Contamination Overview & Site Environmental Management Plan (SEMP)

An overview of the entire local area’s potential for contamination was provided. In addition, a SEMP covering contamination and other issues was then developed to direct further investigations as part of the Local Area Structure Plan.

Phase 2 Environmental Site Assessment

Assessment of environmental liabilities prior to development.

Phase 3 Site Remediation

Atma Environmental was retained by the customer to supervise the removal and disposal of contaminated soil and validate the site after excavation.

Phase 2 Environmental Site Assessment

Assessment of environmental liabilities prior to development.

Soil Sampling

Client wished to develop this property for standard residential purposes. Atma Environmental constructed four targeted boreholes (in suspect fill material) to make sure that the site was suitable for the intended use.

Remediation Project

Firing range use over approximately 15 years left extreme lead levels in a disused quarry requiring remediation to standard residential levels.

Clean Fill Investigation

A new subdivision requiring removal of soil and rock was investigated to ensure the spoil could be classified as clean fill.