Environmental Consulting Jobs Done in Bet Bet 3472

Below is a list of Environmental Consulting jobs done by Atma Environmental in Bet Bet

Phase 1 ESA at Bet Bet, Havelock, Simson, Bealiba, Emu and Carapooee Rail Stations, Victoria (Western Victoria, VicTrack sites)

Railway Lands. Six properties underwent limited Phase 1 investigations. The past and current uses that could potentially contribute to site contamination were identified and the requirements for further intrusive site investigations were detailed.

Phase 1-2 ESA at Additional Land, Beaconsfield Avenue, Beaconsifeld, Victoria

Peri-Railway Land. This report is intended for the purpose of determining the nature and extent of any soil contamination present at the site prior to divestment of the property for development.