Below is a list of Environmental Consulting jobs done by Atma Environmental in North Melbourne
Preliminary Site Investigations at Queensberry St, North Melbourne, Vic.
As a preliminary stage to the above investigations, Atma Environmental completed environmental site inspections and basic historical reviews to advise on the need for further site investigations.
Environmental Site Assessments at Queensberry St, North Melbourne, Vic.
‘Stage 1-2’ limited environmental site assessments were conducted on four Dept of Education sites slated for divestment. Sites included: former textile college (possible PCE contamination), printing campus (UST, lead, PAHs), primary school (uncontaminated), and surplus land (uncontaminated).
ESA for Certificate of Environmental Audit at Former RMIT Print Campus, North Melbourne, Victoria
A soil sampling program to determine the need for any remedial actions and assessment of the likelihood of groundwater contamination. Removal of UST known to be a point source of contamination.
Qualitative Risk Assessment and Remedial Considerations at Queensberry St, North Melbourne, Vic.
A qualititative human health and ecological risk assessment for a residential use context was completed for this former education site (past uses: printing; PAH contamination).
Preliminary Environmental Site Assessment at Wreckyn Street, North Melbourne, Victoria
Soil sampling was undertaken on the former lawn bowls manufacturing site in question to assist the developer in planning re-development of the site. He should have contacted us before he purchased the site!
Phase 2 ESA at LaTrobe Close, North Melbourne, Victoria
The subject property has undergone an Environmental Site Assessment (ESA) for the purpose of due diligence for site re-development. Included derelict factory and an existing high density development as part of the land package.
Desktop Review and GPR Survey at Wreckyn Street North Melbourne
To inform the client on the potential environmental liabilities prior to purchase a limited but very fast desktop review was supplemented with a ground penetrating radar survey (GPR). Formerly Buncle Engineering site – high contamination potential.
Preliminary Environmental Site Assessment at Bedford Place, North Melbourne
A desktop Preliminary Environmental Assessment (PEA) of a site, historically used for tin smithing, was prepared to determine any past potentially contaminating land uses and to inform the planning permit application for a new high-rise residential development.
Soil Disposal Classification Investigation at Macaulay Road, North Melbourne
A pre-existing soil ‘repository’ of 3,800 m3 Category A Prescribed Industrial Wastes was sampled and assessed for soil hazard categorisation. Atma Environmental subsequently liaised with EPAV and managed a successful waste reclassification application enabling the soil to be moved as Category C PIW – resulting in multi-million dollar site development cost savings.
Limited Phase 1 Review
Lots surrounding the rail station, chiefly along Stubbs St, possess a rich and varied industrial history. Our brief included a review of ten previous ESAs by others, reconnaissance of all lots, re-appraisal of existing historical information to advise on the contamination status of each lot and to identify environmental data gaps in the information provided with recommendations made for further work.
Limited Soil Investigation at Shiel St, North Melbourne, Victoria.
To inform worker health and safety prior to gardening works, limited soil sampling was conducted at a State Government office to ascertain contamination levels relative to guideline levels.
Expert Advice at La Trobe Close, North Melbourne
Provision of expert advice to the client regarding the nature and defensibility of a builder’s variation in relation to asbestos soil contamination found during development.
Site Remediation at Arden Street, on Barwise Street, North Melbourne
To clean up an oil contaminated industrial site vacated by it’s tenant, Atma Environmental project managed all necessary equipment and contractors to restore the site to a satisfactory condition and dispose of affected soils.
Contamination OH&S Report at ‘Bastow Institute of Educational Leadership’ Queensberry St, North Melbourne, Victoria
A limited investigation of soil conditions within a work site was undertaken to determine contaminant levels to and to provide advice in regards to the appropriate OH&S measures required based on the testing.
Limited Soil Investigation
Residence. Limited Soil Investigation to assess the contamination status of garden soils conducted.
Contamination Advice
The client engaged Atma Environmental to provide advice on how to move forward with the development of the site with regards to sampling and contaminated soil disposal.
Environmental Contamination Advice
Meeting with the client regarding a site in North Melbourne and to provide advice as to what action is required. A written quotation letter was provided.
Soil Disposal Investigation at Courtney Street, North Melbourne
The Department of Human Services engaged Atma Environmental to collect and analyse soil samples from a proposed bulk excavation area to assist in ascertaining the classification status of the soil for off-site disposal.
Phase I-II ESA for DHS at Errol St, North Melbourne, Victoria
Preliminary site sampling and historical review was undertaken consistent with Dept of Human Service environmental requirements for licensing of a new child care centre.
UST Removal at Lothian Street, North Melbourne, Victoria
Environmental validation and stockpile assessment re an Underground Storage Tank removed inside a factory being redeveloped.
Preliminary Soil Investigation
Conduct soil samples analysis for pre-construction planning purposes.
Environmental Management Plans at Queensberry Street, North Melbourne, Victoria
Contaminated Site. Previous Environmental Site Assessment undertaken at the site, now proposed for redevelopment, required preparation of E.M.P. and workers EH&S Plans by Atma Environmental.
Phase 1 ESA at Curzon Road, North Melbourne, Victoria
Phase 1 ESA to satisfy council requirements prior to re-development. Involved gathering all publically available historical information to determine the environmental suitability of the site.
Phase 2 ESA
The subject property has undergone an Environmental Site Assessment (ESA) for the purpose of due diligence for site re-development. Included derelict factory and an existing high density development as part of the land package.
Preliminary Environmental Site Assessment
Soil sampling was undertaken on the former lawn bowls manufacturing site in question to assist the developer in planning re-development of the site. He should have contacted us before he purchased the site!