Below is a list of Environmental Consulting jobs done by Atma Environmental in Caulfield
Preliminary Environmental Site Assessment at Briggs St and Hawthorn Rd, Caulfield, Vic
A Phase 1 and Preliminary Phase 2 Environmental Site Assessment (ESA) for a commercial garden centre and hardware premises to inform potential site development options and/or divestment. The Phase 1 identified some past plumbing business and metal working uses at the site with some potential for causing land contamination. To remove doubt a preliminary program of soil sampling and analysis was completed confirming lead, nickel and PAHs at concentrations above residential health levels.
Phase 1 ESA at Hawthorn Road, Victoria
Phase 1 site assessment to determine contamination potential prior to redevelopment.
UST Removal at Glen Huntly Road, Caufield, Victoria
Safe removal and validation of a disused petrol tank discover by the builder.